Skip to content
MACA-LOGO@4x
en English
en Englishkm Khmer
  • About Us
    • Creating Sustainable Futures
    • Capabilities
  • Our Business
    • Mining
    • Crushing
    • Infrastructure
    • International
    • Civil
    • MACA Interquip
  • Projects
  • Community
    • Partnerships
    • Merchandise
    • Events
  • Investors
    • ASX Announcements
    • Reports and Investor Briefings
    • Shareholder Information
    • Corporate Governance
    • Notice of Rights of Members
  • Careers
  • News
  • Contact
    • Shop
    • Cart
    • Checkout
    • My Account
Menu
  • About Us
    • Creating Sustainable Futures
    • Capabilities
  • Our Business
    • Mining
    • Crushing
    • Infrastructure
    • International
    • Civil
    • MACA Interquip
  • Projects
  • Community
    • Partnerships
    • Merchandise
    • Events
  • Investors
    • ASX Announcements
    • Reports and Investor Briefings
    • Shareholder Information
    • Corporate Governance
    • Notice of Rights of Members
  • Careers
  • News
  • Contact
    • Shop
    • Cart
    • Checkout
    • My Account
MACA Interquip
en English
en Englishkm Khmer

Project: Tomingley Gold Project

  • Client
  • Alkane Resources Ltd
  • Location
  • Tomingley Gold is located 50 km southwest of Dubbo in central western New South Wales
  • Commodity
  • N/A
  • Start Date
  • October, 2022
  • Duration
  • 3 months

Tomingley Gold Project

MACA Interquip
Refractory Upgrade Front End Engineering Design (FEED)

Alkane Resources Ltd (Alkane) has engaged MIQ to complete a Front End Engineering Design (FEED) for an upgrade to the Tomingley Gold Operation (TGO) processing plant to include a rougher flotation recovery circuit, ultrafine grinding, CIL pre-leach thickener, and flotation reagent preparation.

The FEED phase is to be completed prior to detailed engineering, and construction.

During the FEED, the following critical activities will be completed:

  • Finalisation of key Project Specification and Project Standards.
  • Award of long lead equipment items (including expediting of associated engineering data).
  • Development of cornerstone project drawings and documents required to finalise the Project’s scope, costs and execution program by detailed work breakdown structure.
  • Review of metallurgical testwork results.

Amount: $8.3M

Photos coming soon.

Featured Projects

  • MACA Interquip
placeholder.png

Tomingley Gold Project

Refractory Upgrade Front End Engineering Design (FEED)...
  • Infrastructure

Kimberley Network Project

MACA was awarded the contract for the provision of resources to undertake routine road and highway maintenance and minor works...
  • MACA Interquip
default

King of The Hills Project

MACA Interquip (MIQ) recorded its first large EPC project win when it was awarded an Engineering, Procurement and Construction (EPC)...
View All Projects

AREA OF OPERATIONS

MACA-LOGO@4x
MACA HEAD OFFICE

45 Division Street Welshpool,
Western Australia 6106

Phone: +61 (8) 6242 2600

MACA INTERQUIP

90 Welshpool Road Welshpool,
Western Australia 6106

Phone: +61 (8) 6258 7400

MACA VICTORIA

5 Fowler Road Dandenong,
Victoria 3175

Phone: +61 (3) 5943 3200

Work With Us
Facebook Linkedin Instagram
© Copyright 2023 |

Privacy Policy | Supplier Terms & Conditions | Website by Glide